2BG, installed Nr. 2 pv systems on its own productions sites

2BG announced that has installed and grid connected its pv power plants in 2 of its own production sites, operating from the 20th June 2012 and profiting by incentives program regulated with the Italian Fourth Conto Energia.

First pv system is set up on the roof of the Mechanical Division capable to produce 134.000 Kwh/year, while the second one is present on the laminator assembly factory with its 95.000 Kwh/year; 60% of the total output will be used for 2BG needs.

The generated clean electricity will help to reach the 23 GW of installed green power as goal fixed by the Italian Government within the 31st December 2016, accordingly also to the European energy strategy for the reduction of CO2 emissions.

The selected module technology is mono-crystalline high-efficiency solar cells; all the panels had been realized with 2BG equipment, with the purpose of monitoring the performances in relation to high quality criterions respected during the assembling process.

Partners

Acknowledgements

Solar Media